PROJECT PROFILE

Metro Networks

about img

The Phase-1 network of Namma Metro consists of two corridors viz. East-West and North-South.

East-West corridor is named Purple Line

North-South corridor is named Green Line

The two corridors intersect at Kempegowda station which is a two level interchange station. A commuter who intends to travel from a station in one line(say Trinity in Purple line) to a station in another line (say Peenya in Green line) will have to change the train at Kempegowda station without coming out of paid area. The commuter can buy a single token for the complete journey.

East-West corridor is named Purple Line

Purple Line
1 Deepanjali Nagar
2 Mysore Road
3 Athiguppe
4 Vijayanagar
5 Hosahalli
6 Magadi Road
7 City Railway Station
8 Kempegowda Station
9 M Visveswaraya Station
10 Vidhana Soudha
11 Cubbon Park
12 Mahatma Gandhi Road
13 Trinity
14 Halasuru
15 Indiranagar
16 Swami Vivekananda Road
17 Baiyappanahalli

North-South corridors is named Green Line

Green Line
18 Nagasandra
19 Dasarahalli
20 Jalahalli
21 Peenya Industry
22 Peenya
23 Yeshwanthpur Industry
24 Yeshwanthpur
25 Sandal Soap Factory
26 Mahalakshmi
27 Rajajinagar
28 Kuvempu road
29 Srirampura
30 Mantri Square Sampige Road
31 Chikpete
32 Krishna Rajendra Market
33 National College
34 Lalbagh
35 Southend Circle
36 Jayanagar
37 Rashtriya VidyalayaRoad
38 Banashankari
39 Jayapraksh nagar
40 Puttenahalli

Reaches

For implementation of the Project, four elevated stretches of area called Reaches have been identified as below for convenience of project implementation. Besides, there are two underground sections connecting Reach-1 & Reach-2 in East-West Corridor and Reach-3 & Reach-4 in North-South Corridor respectively. Each Reach constitutes a separate unit for the purpose of administration of contracts and project monitoring...

Section Line Route
Reach-2 West Line Leprosy Hospital to Mysore Road (6.4 km)
Reach-3 North Line Sampige Road to Yeshwanthpur (5.1 km)
Reach - 3A First North Extension Line Yeshwanthpur to Peenya Industry (4.8 km)
Reach - 3B Second North Extension Line Peenya Industry to Nagasandra (2.5 Km)
Reach-4 South Line National College to Rashtreeya Vidyalaya Road (4.1 km)
Reach - 4A South Extension Line Rashtreeya Vidyalaya Road to Puttenahalli (3.9 km)
UG - 1 North-South Underground Line Between Sampige Road and National College (4.0 km)
UG - 2 East-West Underground Line Between Cricket stadium and Magadi Road (4.8 km)
Reach-1 East Line Cricket Stadium to Baiyappanahalli (6.7 km)

Project Highlights

 
Salient features of Project : Route
East west corridor (Purple Line)   18.10 KM
North-south corridor (Green Line)   24.20 km
Total   42.30 km
Elevated section   33.48 km
Underground section   8.82 km
Gauge   Standard Gauge
Traction   750 Volt dc Third Rail
Speed   Max 80 Kmph; Average 34Kmph
No. of stations   40 (33 elevated, 7 Underground)
Travel time   33 / 44 minutes (end to end)
Headway   4 minutes at start; later 3 minutes
Signalling   Automatic Train Protection (ATP) Automatic Train Operation (ATO)
Rolling Stock   3 Cars train set (DMC-TC-DMC) Extendable to 6 Cars train

 

General Consultants of Project:

The General consultants (GC) constitute the core technical design team and Project Management Consultant for the project. It is a consortium comprising of one Indian (Lead Member) and three other international renowned consultant firms

M/s. Rail India Technical & Economic Services Ltd. (RITES), India
M/s. Oriental Consultants Co. Ltd. (OCCL), Japan
M/s Parsons Brinkerhoff International, Inc. (PBI), USA
M/s SYSTRA, France.

Safety:

Commissioner of Railway Safety (CRS), Southern Circle, Bangalore, has been appointed by Government of India for Safety Certification of operations of Namma Metro. The Company gives utmost priority to safety and has all the safety procedures in place. The Company has developed a Safety, Health, Environment Manual

Phase 2 General Information

Click here to view Phase 2 General Information with Alignment map Click here to view Phase 2 Major contracts

SL NO.

Petitions

Details

BMRCL Replies

1 Samanvaya Vedike (R), Jayanagar Click here to view the petition

Click here to view the petition

Click here to view "BMRCL reply"

Click here to view "BMRCL reply"

2 South Bangalore Resident Association. Click here to view the petition

Click here to view "BMRCL reply"

3 Whitefiled Export Promotion Park Industrial Association Click here to view the petition

Click here to view "BMRCL reply"

4 Whitefield Area Commerce & Industries Association (WACIA) Click here to view the petition

Click here to view "BMRCL reply"

5 Jayadeva Interchange Metro Victims Forum. Click here to view the petition

Click here to view "BMRCL reply"

6 HPC Proceedings (Phase-2)
7 Shri.T.R.Rajendra No.35,3rd Main,Raghavendra Nagar,Bg-16.
8 Mr.Goutham Reddv Lakshmi Industries Bannerghatta Road Bangalore.
ಟಿಪ್ಪಣಿ:: ಎಲ್ಲ ದಸ್ತಾವೇಜುಗಳನ್ನು ಪಿಡಿಎಫ್ ನಮೂನೆಯಲ್ಲಿ ಪ್ರಕಟಿಸಿರುವುದರಿಂದ, ದಯವಿಟ್ಟು ದಸ್ತಾವೇಜುಗಳನ್ನು ತೆರೆದು ನೋಡಲು ಅಕ್ರೋಬ್ಯಾಟ್ ರೀಡರ್‍ಅನ್ನು ಅಳವಡಿಸಿಕೊಳ್ಳಿ / Please install Acrobat reader to open the documents, as all the documents are published in pdf format.

Land Acquasition

SL NO.

News

Particulars

1 Preliminary Notification Under Section 3(1), 1(3),28(1) for BMRCL Phase-2 Project posted on 24/10/2013 Click here to download notification in PDF format
2 Preliminary Notification Under Section 3(1), 1(3),28(1) for BMRCL Phase-2 Project posted on 21/10/2013 Click here to download notification in PDF format
3 28(1) for BMRCL Phase-2 Project posted on 03/01/2015 Click here to download notification in PDF format
4 28(1) for BMRCL Phase-2 Project posted on 03/01/2015 Click here to download notification in PDF format
5 28(4) for BMRCL Phase-2 Project posted on 03/01/2015 Click here to download notification in PDF format
6 28(1) notification dated 14.5.2015 in respect of Reach-1 extension from Mahadevapura to Satya Sai Hospital Station. posted on 18/05/2015 Click here to download notification in PDF format
7 28(4) Notification - Puttenahalli cross to Krishna leela Park Station. posted on 03/07/2015 Click here to download notification in PDF format
8 28(1) Notification dated 23-07-2015 in respect of Reach-5 (From Silk board to Muneshwaranagar Station.) posted on 07/09/2015 Click here to download notification in PDF format
9 28(1) Notification dated 08-10-2015 in respect of Reach-5 Depot (Hebbagodi) posted on 10/10/2015 Click here to download notification in PDF format
10 28(1) Notification dated 08-10-2015 in respect of Reach-6 Depot (Kothanur) posted on 10/10/2015 Click here to download notification in PDF format
11 28(4) Notification dated 2nd July 2015 (Pager No. 3085 - 3092) click here to download the notification in pdf format
ಟಿಪ್ಪಣಿ: ಎಲ್ಲ ದಸ್ತಾವೇಜುಗಳನ್ನು ಪಿಡಿಎಫ್ ನಮೂನೆಯಲ್ಲಿ ಪ್ರಕಟಿಸಿರುವುದರಿಂದ, ದಯವಿಟ್ಟು ದಸ್ತಾವೇಜುಗಳನ್ನು ತೆರೆದು ನೋಡಲು ಅಕ್ರೋಬ್ಯಾಟ್ ರೀಡರ್‍ಅನ್ನು ಅಳವಡಿಸಿಕೊಳ್ಳಿ / Please install Acrobat reader to open the documents, as all the documents are published in pdf format.